1030 Music Row - Topping Out
Progress at 1030 Music Row is moving at a rapid speed. On September 14th, the last DLT was placed, officially topping out the timber structure.
Progress at 1030 Music Row is moving at a rapid speed. On September 14th, the last DLT was placed, officially topping out the timber structure.